The tunnel exit will break out of the new wall they built with the orange mesh fencing at top by the railroad tracks. There were two men rapelling on the rock face under the metal mesh to clear up so no rock falls on the tracks.
The dig - one mile long, 18 foot diameter conduit for $140 million to $386 million
